Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Ford Cainta's parking extension - Oh My Buhay

Ford Cainta’s parking extension

Dear husband is busy with some major construction work at Ford Cainta. Approximately 500 square meters of space would be added for parking. What makes construction in that area limiting is the swampy ground due to Cainta’s flooding. We can’t build a multi-story building because the soil is unstable, soft. We can but will have to do piling which is very costly.
That place was underwater during Ondoy,  that was before we built Ford Cainta. When we were constructing we added 2 meter-high soil to elevate the structure and prevent flooding.

construction Ford Cainta

Share

Related Posts