Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the complianz-gdpr domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Goodbye Contractor - Oh My Buhay

I took over the construction of my one bedroom one toilet cottage house. After 7 months, I said goodbye to my contractor. I’ve had enough.  Naubos kasi pasensya ko when I was asking his foreman about the thickness of the roof that he ordered.  I said gauge 5 ba?  Instead of simply saying “hindi mam,  gauge 4 lang kasi yan ang instruction ni engineer”.  Dinagdagan pa.  Gusto ko pala daw ng gauge 5 eh di sana sinabi ko agad para yun ang inorder nya.  He even added that he is just following the orders of his boss,  which is not me.  That I am not his boss,  buti nga daw kinakausap nya ako.   That’s it,  ubos na ang mahaba kong pasensya sa kanila.   Ang bait ko pa dun sa mga workers nila,  tuwing bibisita ako,  I gave them Jollibee, clothes, meron pang Fundador.   On their last day,  naawa pa rin ako,  I gave them a bottle of Fundador again.

The steel trusses have started to rust. I spent a gallon of paint and two days labor to prevent further corrosion.

repainting of steel trusses

I went to the supplier where my contractor supposedly ordered the roofing materials. I found out his foreman only ordered the long spans enough for half my roof. I rejected the delivery. I had the whole roof measured correctly and I ordered everything that I needed to cover the house. I also ordered insulation and gutter.

Out of consideration, I ordered the same dark maroon color that the foreman ordered so I could use the rejected roofing materials for the barn.

roof paint brochure

After I paid half, in three days, the materials were delivered and installed. See, I now have one tiny red roof.
one red roof

Ang bilis. In one day, the gutters had been installed. On the third day, finished na.

The contractor did not include a toilet and bath so ako na lang ang maglalagay. The new workers have started work on my tiny toilet and maid’s room. Para akong masu-suffocate sa liit nung banyo. When I commented “ang liit naman pala”, the new foreman disagreed “Mam, ang laki na nga nito”. The two of us have different concepts of space.

I am adding an open balcony para malagyan ko ng papag at maka idlip sa tanghali sa sariwang hangin. Sarap.

My modern bahay kubo with ugly red roof. If I didn’t take over the construction, for sure wala pa akong bubong hanggang Bonifacio Day.
(view from the other side of the fence)
tiny house with red roof

E——-“Maganda naman pala bahay mo, mukhang health clinic”.
A——-“Oy cute yan pag natapos ko”.

unfinished cottage house, Jan 16, 2016

Share

Related Posts

One thought on “Goodbye Contractor

  1. Ms Annie.. Based on our family’s last experience with an architect and his contractor, ganyan talaga sila pag hindi nababantayan.. Aabutin talaga ng FOREVER yan construction kc mauuna pang MAUBOS ang FUNDS mo before nila TATAPUSIN ang BAHAY mo.. Marami naman mababait na contractor at architect, minsan lang talagang makakatagpo ka ng BAD na mga tao na UUBOS hindi lang ng funds mo, kungdi pati PASENSYA mo.. 🙁

    D bale.. At least, may roof na ang cottage mo.. Konting panahon na lang, matatapos din yan cottage mo.. 😉 Konting pasensya na lang, and u will soon be decorating the interiors of ur cute cottage.. 🙂